Glossary · ISO management system
Major nonconformity (major NC)
also: major non-conformity, major NC
In short
A failure or systematic deficiency that puts at risk the ability of the management system to achieve its intended results. It differs from a minor nonconformity by its severity or its systematic nature. Typical deadline for corrective actions: 90 days.
Reference: ISO/IEC 17021-1:2015
What it means
A major nonconformity, usually just called a major, is the most serious grade of finding. ISO/IEC 17021-1 defines the term in 3.12: a requirement is not fulfilled, and this affects the capability of the management system to achieve its intended results. The note to the definition gives two typical cases: significant doubt that a process is effectively controlled, and several minor nonconformities against the same requirement that together show a systemic failure.
For certification, the grading is decisive. Before deciding on a certificate, the body must have reviewed, accepted and verified the correction and corrective actions for any major nonconformity (ISO/IEC 17021-1, 9.5.2). If, for initial certification, verification is not possible within six months of the last day of stage 2, another stage 2 is required (9.5.3.2). The certification body sets the deadline in each individual case.
In practice and in the audit
In an AI management system under ISO/IEC 42001, major nonconformities rarely arise from a single formal slip. The typical cause is a missing core process: AI systems are in use, yet there is no risk assessment for them, or the impact assessment under 6.1.4 exists only as an empty template. A management review that never took place or internal audits that were never carried out also quickly end up in this grade.
If you receive a major nonconformity, check the reasoning first: against which requirement, based on which evidence, and why does it affect the system’s results? Then follow the three steps from 10.2 of the standard: fix the problem immediately, understand and eliminate the cause, check effectiveness. A quick correction without root cause analysis resurfaces at the next audit.
References in standards and law
I cite standards by clause number and in my own words, never verbatim. Legal texts link to EUR-Lex.
- ISO/IEC 17021-1:2015, 3.12Definition of a major nonconformity, with typical cases in the note.
- ISO/IEC 17021-1:2015, 9.5.2 and 9.5.3.2Verification before the certification decision, six-month limit after stage 2.
- ISO/IEC 42001:2023, 10.2Nonconformity and corrective action in your own management system.
Frequently asked questions
Can several minor nonconformities add up to a major one?
Yes. If they concern the same requirement and together show a systemic failure, the auditor can grade them as a major nonconformity. The note to 3.12 of ISO/IEC 17021-1 names exactly this case.
Related terms
Further reading in the insights
Matching service
Find nonconformities before it matters
An internal audit to ISO/IEC 42001 or ISO/IEC 27001 shows major nonconformities before the certification body finds them, with grading and reference.
To internal auditsAuthor: Lars Zimmermann
Term and explanation in my own words. Researched to the best of my knowledge and reviewed for accuracy.