Residual risk

In short

The risk that remains after the risk treatment measures have been implemented. It must be formally accepted by the risk owner, is kept in the risk register and is reviewed periodically.

Reference: ISO/IEC 27005:2022, ISO/IEC 23894:2023

What it means

No risk can be eliminated completely. What remains after risk treatment is called residual risk. It is the honest answer to the question of which danger a company keeps working with after taking action. A residual risk in the register is therefore no blemish. A residual risk that nobody consciously accepted is the real problem.

Both major management system standards require residual risks to be accepted explicitly. ISO/IEC 27001 places this in 6.1.3 f) with the risk owners, who approve the treatment plan and accept the remaining risks. ISO/IEC 42001 requires in 6.1.3 that the designated management approves the treatment plan and accepts the residual AI risks. For AI, ISO/IEC 23894 also recommends weighing remaining risks against the benefits where the consequences cannot be reduced further (6.5.2).

In practice and in the audit

With AI, residual risks are often larger than people are used to from classic IT. A language model can still produce false statements after tests, filters and human review. Image recognition in quality inspection still misses individual defects after validation. Write this into your register as concretely as possible: which risk remains, why is it acceptable, and who accepted it?

The audit checks whether the acceptance is traceable and current. A residual risk accepted long ago, although the model, data or intended use have changed since, is a typical starting point for a finding. So define when residual risks are reassessed, for example at every model change and in the management review, and record the acceptance with date and name.

References in standards and law

I cite standards by clause number and in my own words, never verbatim. Legal texts link to EUR-Lex.

  • ISO/IEC 27001:2022, 6.1.3 f)Approval of the treatment plan and acceptance of residual risks by the risk owners.
  • ISO/IEC 42001:2023, 6.1.3Approval of the treatment plan and acceptance of residual AI risks by designated management.
  • ISO/IEC 23894:2023, 6.5.2Selecting treatment options and weighing benefits against remaining risk.

Frequently asked questions

Who may accept a residual risk?

Under ISO/IEC 27001 the respective risk owner, under ISO/IEC 42001 the designated management. What matters is that the person has the authority to decide on the risk and that the acceptance is documented.

Related terms

Further reading in the insights

Matching service

An AI risk process that holds

I build the risk process under ISO/IEC 42001 with you, from criteria through treatment to the documented acceptance of residual risks.

To ISO 42001 readiness

Author: Lars Zimmermann

Term and explanation in my own words. Researched to the best of my knowledge and reviewed for accuracy.